Quebec Solar Rebates 2026

This guide covers solar rebates in Quebec for 2026. It focuses on current federal, provincial, territorial and utility programs that can reduce the cost of residential solar panel installations. Program rules can change during the year, so the status below is based on information reviewed on August 8, 2026.

For programs that cover other types of work, see the complete Quebec home renovation rebates and grants guide.

2026 availability: Available programs identified.

2026 rebates and incentives at a glance

ProgramStatusPotential helpWho / what it targets
Hydro-Québec LogisVert Efficient Homes ProgramActiveHeat pumps up to $6,700; solar $1,000/kW subject to limits; other measures varyOwners and, for some measures, tenants of eligible Quebec homes and residential buildings
Hydro-Québec LogisVert Solar PanelsActive$1,000 per installed kW, up to 40% of purchase and installation costSolar panels installed on or after June 30, 2025 can qualify when all LogisVert conditions are met.

Available solar rebates in Quebec

Hydro-Québec LogisVert Efficient Homes Program

Status: Active. Maximum/benefit: Heat pumps up to $6,700; solar $1,000/kW subject to limits; other measures vary.

Hydro-Québec LogisVert Efficient Homes Program can help with Heat pumps; solar panels; roof insulation and caulking; induction ranges; heat-pump dryers; geothermal; electric thermal storage and other measures. Eligibility varies by measure, home type, equipment and installation date. Some grants are claimed by the homeowner while selected central-heating measures are applied through authorized installers.

Application: Use the current LogisVert residential measure page to confirm the exact equipment and invoice requirements before purchase. Submit the online grant application with proof of ownership, invoices and equipment information.

Official information: program website

Hydro-Québec LogisVert Solar Panels

Status: Active. Benefit: $1,000 per installed kW, up to 40% of purchase and installation cost. Solar panels installed on or after June 30, 2025 can qualify when all LogisVert conditions are met.

Official information: program website

What solar panels work can qualify?

Depending on the program, eligible work can include residential solar photovoltaic systems; inverters; eligible installation work; grid interconnection costs where permitted. The exact specification matters: a product or installation can be energy efficient and still fail the program’s technical requirements.

Solar incentives may interact with net metering, electrical permits and utility interconnection approval. A rebate does not replace those requirements.

How to apply without losing the rebate

  1. Check the program status before spending money. Confirm that applications are open and that your home, utility account and household meet the rules.
  2. Verify the project requirements. Confirm pre-approval, net-metering/interconnection rules, equipment standards and installer requirements before signing a contract.
  3. Get written quotes. Ask the contractor to identify model numbers, efficiency ratings, labour and materials separately.
  4. Wait for approval when required. Several programs reject work that starts before an assessment, registration or pre-approval.
  5. Keep all proof. Save invoices, proof of payment, product labels, permits, photos and energy-assessment reports until the rebate is paid.

Can you combine programs?

Sometimes. A federal tax credit, provincial rebate, utility incentive, municipal top-up or financing program may be used together, but stacking rules differ. Many programs also state that total public funding cannot exceed the eligible project cost. Check the terms of every program before assuming two incentives can be combined.

Compare this page with the Canada-wide solar rebates guide.

Related renovation rebates

Frequently asked questions

Are solar rebates available in Quebec in 2026?

Programs vary by household, property, utility and project. The table above shows the main programs identified in our verified 2026 program set and their current status.

Should I apply before starting the renovation?

Yes whenever the program requires a pre-retrofit assessment, registration, quote approval or pre-approval. Starting too early is one of the most common reasons an otherwise eligible project is rejected.

Can labour and installation costs qualify?

Often, but not always. Some programs pay a fixed amount per product or measure; others calculate support from eligible invoiced project costs. Read the program rules before signing the contract.

Do I need to use an approved contractor?

Many energy programs require a licensed, registered or program-approved contractor for specific upgrades. Self-installation can make a project ineligible even when the equipment itself qualifies.

How current is this page?

The program status and amounts on this page were reviewed for August 8, 2026. Always confirm the official source immediately before applying or purchasing equipment.